The whole steel package, from one company.
We fabricate the structural steel, supply the stairs and rails, and erect it all with our own crews. A general contractor signs one contract and holds one company accountable.
Approved to bid
The approvals a New York estimator checks first.
Fabricator and erector certification, audited twice a year.
New York City public school construction.
New York State dormitory and public work.
Precast plank erection.
Single source
Most fabricators sell you one piece of the job.
On a typical job the steel is fabricated by one company, the stairs and rails come from a second vendor, and a third crew erects it. Three contracts, three schedules, three companies to chase. At Barone, structural steel, miscellaneous metals, and erection are departments of the same company.
- 01One contract
Structural steel, miscellaneous metals, and erection, priced as one package or as separate scopes.
- 02One schedule
One project management team runs shop drawings, approvals, deliveries, and the field schedule.
- 03One company accountable
Installation is never subcontracted. Nobody points fingers, because there is nobody else.

01 / 04Structural steel
The structural frame, made in Newark.
Our shop around the corner from Newark Airport fabricates columns, beams, and framing for jobs across the New York metro. It is heavily automated, with robotic welding and an equipment layout we spent six months planning, and it is AISC certified and audited twice a year.

02 / 04Miscellaneous metals
Stairs and rails, without a second vendor.
Stairs, rails, lintels, and the rest of the miscellaneous metals come out of the same shop as the structural frame. On most jobs that scope goes to a separate company with its own schedule. Here it rides on the same contract as the steel.

03 / 04Project management
One team between the award and the field.
Once a job is awarded, our project management department runs it: shop drawings, approvals, deliveries, and the field schedule. The office that coordinates the drawings also schedules the crews, so a general contractor deals with one team for the whole steel package.

04 / 04Erection
Set by our own ironworkers.
Installation is never subcontracted. Our own field crews set the steel and metals our Newark shop fabricated, across the New York metro.
- Installation subcontracted
- 0%
- Field employees
- ~300
Recent work
Named jobs, and what we delivered on each.
Barnard CollegeManhattanA steel roof structure on the Barnard College campus in Morningside Heights.Scope: Structural steel · Miscellaneous metals · Erection
38 West 66th StreetManhattanA 775-foot tower on the Upper West Side beside Central Park, with a crown framed in exposed steel.Scope: Structural steel · Erection
422 Fulton StreetBrooklynDowntown Brooklyn: a crane section lifted over Fulton Street, and our field crew on site.Scope: Structural steel · Erection
Request an estimate
Bidding a job in the New York metro? Send us the drawings.
Our estimating department prices structural steel, miscellaneous metals, and erection as one package or as separate scopes. Tell us the bid date and we will work to it.
Request an estimate- 1Structural and architectural drawings, with addenda
- 2Project name, address, and delivery method
- 3Bid due date
- 4Scope: structural, miscellaneous metals, erection, or all three
Drawings can be attached to the estimate form or sent by email. team@baronesteel.com